After a few months of having the tiles sink into the wall and a leaky shower, we were able to fix/re tile our shower. Top Jimmy from Golden came out to help us take care of it. I don't know why the photos are getting tilted because they are upright when I upload them.
After the demo work, we needed to raise the shower head, since is was shorter than me.
The new and improved shower head height.
The tools of the trade
The first row of tile is drying .
The finished product.
We also put on a higher shower head in the bath tub too. Now we can wash the boy with ease!
piz : )
No comments:
Post a Comment